Seven Islands Park Bridge
Progress Information
Address:
2809 Kelly Lane, 37914
Architect: Michael Brady Inc.
Construction Manager: T.B.D.
Budget: $1,645,000
Construction Start Date: March 2006
Estimated Completion Date: April 2007
Description:
A pedestrian / bicycle bridge to cross the French Broad River. The bridge will cross the French Broad in an area designated for natural preservation.
Progress:
A No Rise Study was executed between BWS&C and PBA. The initial run of the study has been completed. The calculations are based on MBI's "conceptual" bridge piers and show that we will need to provide additional storage to offset the displacement by the piers. The 26A has been issued and TVA has 30 days.
A pedestrian / bicycle bridge to cross the French Broad River. The bridge will cross the French Broad in an area designated for natural preservation. A No Rise Study was executed between BWS&C and PBA. The initial run of the study has been completed. The calculations are based on MBI’s “conceptual” bridge piers and show that we will need to provide additional storage to offset the displacement by the piers. The 26A has been issued and TVA has 30 days. |
Upcoming Events at this Project Site
T.B.A.