Beck Cultural Exchange Center
Progress Information:
Address: 1927 Dandridge Avenue 37915
Architect: Sparkman & Associates
Construction Manager: Johnson & Galyon
Budget: $2,179,000
Construction Start Date: March 2005
Estimated Completion Date: October 2005
Description:
The project consist of renovation of the existing Beck Home with the addition of a multipurpose room and limited library concept, which will focuses on the needs of the community.
Progress:
A kick-off design meeting for the Gateway Center was held August 30. Progress for the meeting room include: completion of split face CMU, permanent power, completion of the metal stud framing soffits, crossover walls are 95% complete, coping was delivered September 2 and HVAC ductwork rough-in is complete. Library progress includes: completion of framing/siding trim work, electrical is roughed-in, site work grading has mobilized and will commence once weather permits. Progress regarding the house include: HVAC connected feeder to panel L is pulled and terminated, termination of branch circuits for panel L and HVAC condensing unit for AC-4 is set and piped. The patching and insulating of walls is ongoing and sanding should be completed by September 2.
Click here to see the Beck Cultural Exchange Center location on the Project Progress Map
Upcoming Events at this Project Site
T.B.A.
Photos/Renderings